Computer Integrated Systems Design / Mong Kok, Hong Kong

A switchgear long hall built for breaker work, coil work and honest paperworkOVERHAUL

Shanghai Hanyi Electromechanical Limited operates a working switchgear long hall from Rm 05 25/F Wealth Coml Ctr, 42-56 Kwong Wa St, Mong Kok, Hong Kong - 999077, Hong Kong (HK). Six breaker bays line the hall, each one rebuilt, rewound and certified before it returns to a live board. The team treats every incoming cubicle as a document as much as a machine, so the work is recorded in the same order it is performed. See how the six services run on the hall floor →

Book a breaker bay inspection for your board→

The hall handles low and medium voltage switchgear, control panels, protection relays and the smaller integrated systems that sit around them. Nothing leaves the Kwong Wa Street floor without a matching test certificate.

Rectifier 400 V boards Coil rewind to class F Thermal survey in live halls Spares held under counter shift

The hall at a glance

Six bays, one long hall, a single standard

The Kwong Wa Street hall is not a workshop with benches pushed to the wall. It is laid out lengthwise so a breaker can move from intake to test without ever turning back on itself. That straight path is the reason the same crew can inspect, overhaul, rewind, certify and hand back a board in one continuous run.

Each bay holds one breaker at a time, and each bay carries its own lifting frame, current injection lead set and insulation tester. The bays are painted in a matte dark grey so that flashover marks, arcing carbon and loose filings show up in seconds under the hall lights. A bay is never shared between two jobs. When a callout comes in at short notice, the rota desk reassigns the next free bay rather than doubling up on an occupied one.

Between the bays runs a coil rewind run: a line of winding lathes, an oven, and a rack of copper stock sorted by gauge. Coils pulled from a breaker go straight onto the lathe and are rewound while the breaker frame stays in its bay, which keeps the two halves of the same job within sight of each other. The run is long enough to hold six coils in various stages, from stripping to varnishing, without any of them leaving the hall.

At the far end of the hall sits the test certificate desk. It is deliberately placed at the exit, because no breaker passes it without a signed test record. The desk holds the injection relay set, the primary injection unit and the log books for every board the hall has ever touched. When a client asks what happened to a particular cubicle in 2019, the answer is in a bound book on that desk, not in a database somewhere else.

The remaining floor space holds the spares counter and the thermal scan round. The counter is a pigeonholed wall of small parts: trip coils, closing coils, auxiliary contacts, fuses, gaskets, and the odd obsolete relay that cannot be bought new. The thermal round is a mobile kit that leaves the hall weekly to photograph busbars and terminals in a live plant. Together they let the hall promise something unusual: a breaker can be rebuilt, rewound, certified and re-fitted with the parts it needs without ever leaving the building.

The coil ledger

Six services and the turnaround each one promises

The ledger is kept in a cloth-bound book on the hall floor and copied here for clients. Each row names a service and the promise that goes with it. If the promise is missed, the ledger records why, in the same ink.

Service
Turnaround promise
S

Breaker Overhaul Bays

One bay per breaker

A standard low voltage breaker is stripped, cleaned, re-lubricated, adjusted and reassembled inside four working days. Medium voltage units that need new arc chutes are quoted a fixed date at intake and held to it. No bay is double-booked, so the date given is the date kept.

H

Coil Rewind Runs

Strip, wind, varnish, bake

Trip and closing coils are rewound to the original class and resistances are logged before and after. The bake is completed overnight, so a coil that arrives before ten in the morning is back on its breaker the following day. Every rewind carries its before and after reading.

E

Test Certificate Desks

Sign off at the exit

The certificate is written the same day the tests finish, not weeks later. Contact resistance, insulation resistance, trip timing and injection results are recorded against the breaker serial. The signed sheet travels with the breaker and a duplicate stays in the desk log.

N

Thermal Scan Rounds

Live boards, weekly

A scan round is booked in two hour blocks and covers up to forty terminals per board, with a photograph of every hot spot. Findings are ranked and a shortlist of parts is sent the same week. The round is repeatable, so the next scan can be compared against the last.

T

Spares Counter Shifts

Obsolete parts, held

A counter shift is held open for walk in trade every weekday morning. Anything under the pigeonhole wall is sold over the counter, and anything missing is sourced with a written lead time. Obsolete relays are kept for as long as the plant keeps the board.

L

Emergency Callout Rota

Out of hours cover

The rota covers nights, weekends and public holidays for contracted boards. A call is answered by a named engineer who already holds the board drawings. Response is within two hours inside Hong Kong, with a spare breaker pulled from the hall when the fault cannot wait.

Standards kept on the floor

How the hall reads a breaker before it touches one

Every job starts with the same intake sequence, whether the breaker is a small moulded case unit from a shop board or a draw-out medium voltage cubicle from a plant substation.

  • 01

    Intake reading. Serial, frame size, trip unit type, coil resistance and insulation resistance are recorded on a paper ticket before the breaker is wheeled to a bay. Nothing is assumed from the label.

  • 02

    Strip and inspect. Arc chutes, contacts, operating mechanism, springs and wiring are separated, cleaned and checked against the manufacturer drawing. Any part that has changed shape is replaced rather than dressed.

  • 03

    Rewind and refit. Coils that fail the resistance check go straight to the rewind run. They return to the same bay with a paper tag showing the original and final reading.

  • 04

    Adjust and test. Trip and closing times are set against the curve, then confirmed with primary injection. The certificate desk signs off only when the numbers match the drawing.

  • 05

    Hand back. The breaker is bagged, tagged and handed over with its certificate, its test sheet and, where relevant, a comparison scan from the thermal round.

Who the hall works with

Boards that cannot stop running

Most of the work that comes through the Kwong Wa Street hall belongs to buildings and plants that cannot afford a long outage. That shapes how the hall is run.

Commercial buildings in Kowloon and on Hong Kong Island send main switchboards, generator changeover panels and landlord distribution boards. Their managers care about two things: a spare breaker that matches the existing one, and a certificate that the building surveyor will accept without further questions. The hall keeps both in mind. Spare breakers of common frame sizes are held under the spares counter shift, and the test certificate desk writes to the format the local surveyors already recognise.

Small factories across the New Territories send moulded case breakers, motor starters and control panels. Here the work is often about age rather than fault: a coil that has cooked itself dry over a decade, a contact that has worn to a thin blade, a trip unit that no longer matches its label. The rewind run and the breaker bays handle those in the same pass, and the ledger records the original condition so the plant can see what changed.

Data rooms and small integrated systems bring a different request. They want a thermal scan round before anything fails, then a timeline of scans so a slow rise at a terminal is caught before it becomes a trip. The hall treats those scans as a scheduled service rather than an emergency response, which is why the rota covers the same sites on a fixed weekly or monthly pattern.

Finally there are the callouts. A board trips at three in the morning, a lift motor starter refuses to close, a generator fails to change over during a test. The emergency rota exists for those moments. An engineer arrives with the drawings already in hand, isolates the board safely, and either restores the circuit or brings a spare breaker from the hall and returns the failed one to a bay the next morning.

Why the hall is laid out this way

A straight line beats a clever one

Switchgear work punishes shortcuts. A breaker that is stripped on one bench, rewound at another, tested somewhere else and certified at a fourth place tends to lose a part, a reading or a sheet along the way. The long hall removes those hand-offs by keeping the whole sequence inside one sight line. An engineer can look up from a lathe and see the breaker that the coil belongs to waiting in its bay.

That arrangement also makes the work easier to audit. When a client visits, they can walk from the intake ticket to the bay, from the bay to the rewind run, from the run to the certificate desk, and read the same serial number at every stop. Nothing is hidden behind a closed door or an unlabelled shelf.

The palette on this page follows the hall itself. The walls are a pale galvanised green, the bays are a deep charcoal, the status lamps and the insulation tape on the benches are a red orange, and the grease chips on the spares wall are a muted green that appears nowhere else. The colours are not decorative; they are the ones a person would find if they walked the Kwong Wa Street floor with a camera.

If you are planning a shutdown, a scan round or a rewind, the fastest way to begin is a short conversation about the board and the breaker. Bring the serial and the drawing if you have them. If you do not, the intake sequence will find them for you.

Records the hall keeps

Why the paperwork is part of the machine

A switchgear board is a long lived thing, and the people who look after it change more often than the board itself. A building manager who inherits a substation may find no drawing, no setting sheet and no record of the last overhaul. The hall keeps those records for the boards it has touched, so that a new manager can pick up the history rather than start again. The certificate desk logs are the clearest example, but the coil ledger and the scan image sets do the same work in their own way.

That habit changes how a job is priced and planned. When the hall already holds the drawing for a board, a breaker overhaul can be quoted without a site survey, and the bay can be booked on a firm date. When the drawing is missing, the intake sequence has to rebuild it from the equipment itself, which is slower but produces a record that the client keeps. Either way the client leaves with the same set of documents.

The records also make the emergency callout rota workable. An engineer who arrives at a board at night cannot afford to learn the panel from scratch. The folder in the desk log holds the drawing, the last test sheet and a note of the spare breaker held for that site. That is why the rota answers with a named engineer rather than a general number, and why the response promise can be a firm two hours rather than a hope.

For a client who wants the whole picture, the hall can prepare a short history of a board: when it was scanned, when it was overhauled, which coils were rewound and what the readings were. It is not a glossy report, and it is not meant to be. It is the same set of facts that the hall uses when it decides what a board needs next.

Start with the board, not the brochure

Tell the hall what is tripping, what is overdue for a scan, or which breaker has been sitting on a shelf for a decade. A short call is enough to decide whether the job belongs in a bay this week, in the rewind run next week, or on the rota for an out of hours visit.

Shanghai Hanyi Electromechanical Limited keeps its switchgear long hall at Rm 05 25/F Wealth Coml Ctr, 42-56 Kwong Wa St, Mong Kok, Hong Kong - 999077, Hong Kong (HK). The counter shift is open weekday mornings and the rota covers nights and weekends for contracted boards.

Write to info@nertelenergy.buzz or call +17319373354 to book a bay inspection. If you already know the service you need, the services page lists every turnaround promise in the ledger.

Open the contact page →
●2026 Shanghai Hanyi Electromechanical Limited Overhaul / Rewind / Certify