The six services that run down the hall

Shanghai Hanyi Electromechanical Limited performs switchgear overhaul work in one continuous hall. Every service below is a station on the same floor, so a breaker moves from bay to rewind run to certificate desk without a hand-off to a third party. The promises are the same ones written in the coil ledger on the floor.

S

Breaker Overhaul Bays

Four working days for standard low voltage units

The six breaker bays are the spine of the hall. Each bay holds one breaker under its own lifting frame, with current injection leads and an insulation tester kept at the bay rather than borrowed from a shared trolley. When a breaker arrives it is photographed on all six faces, weighed against its frame sheet, and tagged with a bay number before any bolt is turned. The photograph set matters later, because it settles the question of whether a scuff or a crack was already there at intake.

Overhaul means a full strip rather than a wipe down. Arc chutes come off, contacts are measured against the drawing, the operating mechanism is cleaned of old grease and re-packed with the specified compound, and every spring is checked for set. Parts that have changed shape are replaced rather than dressed back into service. The bay stays busy only for one breaker at a time, which is why the date given at intake is a date the hall can keep.

Medium voltage draw-out units take longer and are quoted separately. They need the same strip plus shutter work, racking checks and, often, new arc chutes. The bay team writes the extra steps onto the intake ticket so the certificate desk knows what to test and the client knows what to expect on the invoice. If a fault turns out to be deeper than the intake suggested, the hall calls before spending further time, because a surprise invoice is worse than a delayed one.

H

Coil Rewind Runs

Strip, wind, varnish and bake inside one overnight cycle

The rewind run sits between the bays and the certificate desk, and it is deliberately within sight of the breaker that each coil belongs to. Trip coils and closing coils are the most common customers, but the run also handles undervoltage releases, shunt trips and the small actuating coils found on older control panels. Every coil is stripped to the core, its former inspected, and the original wire gauge and turn count confirmed before winding begins.

The winding lathes are set for the gauge in use, and the resistance of the finished coil is read on the bench before the varnish bath. That reading is compared to the original and written on a paper tag that travels with the coil back to its bay. Varnish is applied by dip and the coil is baked overnight, so a coil that arrives before ten in the morning can be back on its breaker the next day. Coils that arrive later in the day join the following bake, and the intake ticket says so.

Rewinding is a service the hall takes seriously because a rewind that is slightly off can look perfect and still trip a board at the wrong moment. The rule on the floor is simple: no coil leaves the run without a before and after resistance reading and a visual check under the bench lamp. If a coil former is cracked or a terminal post is loose, the run repairs it or replaces it rather than winding onto a part that will fail again.

E

Test Certificate Desks

Signed on the day the tests finish

The certificate desk is placed at the exit of the hall so that no breaker leaves without a sheet. The desk holds the primary injection set, the secondary injection relay tester, a micro-ohmmeter and the bound log books that go back to the first day the hall opened. Contact resistance, insulation resistance, trip timing and closing timing are all measured on the floor and written down by the engineer who performed the test, not by a clerk reading a screen later.

The certificate follows a format that local building surveyors and plant insurers already accept. It names the breaker serial, the frame size, the trip unit settings used, the test currents applied and the pass limits. Where a breaker has been rewound, the coil readings from the rewind run are copied onto the same sheet so that the whole job reads as one document. A duplicate stays in the desk log, which is why the hall can answer a question about a board tested several years ago.

The desk also handles repeat certification for breakers that have not been overhauled but need a periodic paper trail. That is a shorter visit: the breaker is isolated, tested in place or removed to a bay if the board layout demands it, and the certificate is issued against the current settings. Either way, the promise is the same. The certificate is written the same day the tests finish, and the client receives it with the breaker rather than weeks afterwards.

N

Thermal Scan Rounds

Live boards, two hour blocks, repeatable records

Thermal scanning is the service that most often prevents a callout. A scan round is booked in two hour blocks and covers up to forty terminals per board. The engineer works on a live board with the covers in place, photographing every terminal and busbar joint with an infrared camera, and marking each image with the board name, the panel reference and the time. Hot spots are ranked against a simple scale so the client sees which ones need attention this week and which can wait for the next shutdown.

The value of the round depends on it being repeatable. The same camera, the same angles and the same terminal references are used each time, so the next scan can be laid beside the last one and compared without interpretation. That is how a slow rise at a cable lug is caught months before it becomes a burn. The hall keeps the image set for each contracted board and hands over a shortlist of parts the same week, so the spares counter shift can prepare replacements in advance.

Scan rounds also feed the overhaul bays. A breaker that shows a hot terminal in a scan is often a breaker that needs its contacts dressed or its lugs re-torqued, and the image gives the bay team a starting point. For plants that run a scheduled maintenance calendar, the hall books the rounds for the whole year at once, so the dates sit beside the shutdowns rather than being arranged one visit at a time.

T

Spares Counter Shifts

Weekday mornings, over the counter

The spares counter is a pigeonholed wall at the side of the hall, sorted by part family and labelled by hand. Trip coils, closing coils, auxiliary contacts, fuses, gaskets, terminal shrouds and the occasional obsolete relay that cannot be bought new are all held there. A counter shift is open every weekday morning for walk in trade, so an engineer with a failed part can bring it in, match it on the wall and leave with a replacement without waiting for a purchase order to clear.

Parts that are not on the wall are sourced with a written lead time rather than a vague promise. The counter keeps a record of every part it has supplied, which makes it possible to tell a client that a particular coil was replaced three years ago and with which reading. That record is also how the hall decides what to keep in stock. If a part family has been asked for twice in a season, another bin appears on the wall.

The counter is not a retail shop and does not try to be. It exists to keep the overhaul bays and the callout rota moving. When a contracted board trips at night and the rota engineer needs a closing coil, the counter wall is where it comes from. That is why obsolete parts for long lived boards are kept for as long as the plant keeps the board, even when the part has not moved for years.

L

Emergency Callout Rota

Nights, weekends and public holidays for contracted boards

The rota covers contracted boards outside normal hours. A call is answered by a named engineer who already holds the drawings for that board, which removes the slow first hour of a callout spent asking what the panel contains. The engineer arrives, isolates safely, diagnoses the fault and either restores the circuit on site or pulls a matching spare breaker from the hall and returns the failed one to a bay the next morning.

The response promise inside Hong Kong is two hours from the call being accepted. That promise depends on preparation, so the rota is built around a short list of contracted sites with known boards rather than an open offer to every caller. Each contracted site has a folder in the desk log: drawings, previous test sheets, thermal scans and a note of which spare breaker is held for it. When the call comes in, the folder is already open.

After a callout the failed breaker is not simply repaired and forgotten. It goes through the normal intake sequence, and the certificate desk records what failed and why. Over time those records show which boards are aging badly and which need a planned shutdown rather than another night visit. That is the honest purpose of the rota: to keep a board running tonight, and to give its owner a clear reason to plan for tomorrow.

How a job moves

The process overview

Every service on this page shares the same intake, the same floor and the same certificate desk. The sequence below is the one a breaker follows from the moment it enters the Kwong Wa Street hall.

  • Enquiry and intake ticket

    A call or email opens the job. The serial, frame size and board reference are recorded on a paper ticket before the breaker is moved.

  • Bay allocation

    One breaker per bay. The intake ticket names the bay and the date the work is promised, and that date does not move for another job.

  • Strip and rewind

    Mechanical parts are stripped in the bay while coils go to the run next door. Both halves of the job stay on the same floor.

  • Test and certify

    Primary injection, contact resistance and trip timing are measured at the exit desk and written onto the certificate the same day.

  • Hand back and follow up

    The breaker is bagged and tagged with its certificate. Where a scan round is in place, the next visit is already booked.

Book the bay that fits the job

If you know which service you need, say so and the hall will confirm the next free bay, the rewind slot or the scan date. If you are not sure, describe the symptom and the engineer will point you to the right station on the floor.

Shanghai Hanyi Electromechanical Limited, Rm 05 25/F Wealth Coml Ctr, 42-56 Kwong Wa St, Mong Kok, Hong Kong - 999077, Hong Kong (HK). Call +17319373354 or write to info@nertelenergy.buzz.

Go to the contact page →
●2026 Shanghai Hanyi Electromechanical Limited Overhaul / Rewind / Certify